Project Overview:

Build comprises three phases, including all associated Enabling Works and Infrastructure Works.

 

Three concrete framed apartment blocks have racecourse views and the development is within the Racecourse site and is a joint venture with Newbury Racecourse being developed over a 10 year period.

NEWBURY

Key Constraints:

Given the nature of the project, there were a number of constraints which were taken into the consideration in the design & planning phase:

Works in close proximity to the operational Racecourse

No working on Race days and management of activities around the Racecourse Racing days and events

Environmental protection and Arboricultural Protection

Environmental and ecological issues

New road bridge over operational railway

Demolition

Localised remediation

Highways works and Utilities diversions

Multi-storey construction

Limited space & multi-storey: required Tower Crane for building process

Elevated levels of ground gases

Appointing Client:

 

Client CDM Advisor /

Principal Designer:

 

Project Size:

 

 

Overall Project Value:

David Wilson Homes Southern

 

GHPC Group Ltd

 

 

Masterplanning development of 1,500 residential units and associated infrastructure & racecourse redevelopment

 

approx £42m

DWH_Logo_Landscape_White_BG_sml_6.0
newbury logo
20704148594_19c1e7d4fc_o (1280x855)
RICS logo online black landscape.jpg
JPEG Logo - SMAS SSIP - Mono

GHPC Group Ltd © 2019

t: 01344 304 800

Registered in England at 11 Milbanke Court, Milbanke Way, Bracknell, Berkshire, RG12 1RP

No: 618 3571

APS Corporate Member - mono - CROPPED
In-2C-128px-TM
twitter-bird-white-on-blue
HBF08 MemberOfLogoFINAL
2813 GHPC Final Logo HiRes
GHPC - Construction Support - New (1280x960)
Nav 2 left black large
CDM-C Photo - Large
CDM-C Photo - Large

Home > Portfolio > Newbury

bottom of page