top of page

Leybourne Chase,

Leybourne, West Sussex

Project Overview:

The overall project consists of the redevelopment of Leybourne Grange Psychiatric Hospital and Leybourne Grange Manor House and associated grounds, in a venture with the Homes & Communities Agency (HCA), which will provide a substantial regeneration project to the surrounding area, with the project developed and constructed to extensive sustainability criteria.

 

Plans involved the construction of around 702 new build units and 21 refurbished units, providing a range of accommodation from terraced to detached houses to apartments and 1 bed to 4-5 bed homes with associated infrastructure, community facilities and extensive landscaped areas.

 

GHPC was appointed as CDM Co-ordinator and Client CDM Advisor for the whole redevelopment project and also carried out working drawing packages for the first two housing phases - all units were developed to a minimum of Code Level 3 of the Code for Sustainable Homes, with all HA units meeting HQI and Lifetime Homes standards.

 

A diverse range of homes are linked through a selective palette of materials and the selection of a bespoke detailing style which runs as a theme throughout the development.

LEYBOURNE

Client:

 

Ph1 & 2 Architect:

 

CDM Co-ordinator /

Client CDM Advisor:

Taylor Wimpey

 

GHPC Group Ltd

 

GHPC Group Ltd

leybourne2
J2 Elevation
J2 Section
leybourne 5

Key Works Phases:

As an extensive redevelopment site, the overall project involves:

Multi-phase building clearance & asbestos removal

Multi-phase demolition of former hospital buildings covering an extensive site

Substantial Enabling Works

Creating of new A20 Link Road

Multi-phase residential construction works

Redevelopment of Listed Manor House

School Extension to Special Education Needs School within the grounds

Extensive Infrastructure works to create development road & services networks

Strategic Landscaping Works including Attenuation Ponds, Acoustic Bunds, Sports Field & Pavilion, MUGAs & LEAPs

TW_LOGO_CMY - Cropped

Key Constraints:

Given the nature of the development site, there were a number of constraints which were taken into the consideration in the design & planning phase:

Demolition of former hospital buildings covering an extensive site

Significant existing services crossing site which had to be identified, located and terminated prior to works

Significant building clearance & asbestos removal works including potential risks relating to lead, hospital wastes (including x-rays), weil's disease, contamination etc.

Brownfield site - contamination issues and substantial underground tanks and pipe runs

Close proximity to occupied school for special needs and works in and around occupied school

leybourne 6

Substantial ecological and environmental considerations

Works in proximity to a watercourse

Works in live highway and in close proximity to major motorway

Ground Conditions & some Stability Issues during construction

Structural Stability issues of existing buildings

Public Rights of Way crossing and close to site

Manor House Listed Building

Phased occupation of newly constructed residential areas / segregation of ongoing construction works - traffic management challenges

Co-ordination of multi-phase works and contractors

leybourne 3
20704148594_19c1e7d4fc_o (1280x855)
RICS logo online black landscape.jpg
JPEG Logo - SMAS SSIP - Mono

GHPC Group Ltd © 2019

t: 01344 304 800

Registered in England at 11 Milbanke Court, Milbanke Way, Bracknell, Berkshire, RG12 1RP

No: 618 3571

APS Corporate Member - mono - CROPPED
In-2C-128px-TM
twitter-bird-white-on-blue
HBF08 MemberOfLogoFINAL
2813 GHPC Final Logo HiRes
Nav 2 left black large
Design Photo - Large
CDM-C Photo - Large
GHPC - Construction Support - New (1280x960)

Home > Portfolio > Leybourne

bottom of page