Twickenham Station Re-development

The Solum Twickenham Station development is a welcoming new gateway to the town centre, with 115 new homes in 3 Blocks along with shops and restaurants built around a new public plaza and river walk. The maximum height of the development is 7 storeys with stepped levels. The development is constructed on piled foundations and the podium spans across the railway tracks. The buildings are reinforced concrete frame. The podium was constructed over the live railway with key track possessions for bridge installation, erection of hoardings, selected foundations, drainage etc.

Client(s)

Principal Contractor(s)

Osborne

No. of Units

115 units

Key Constraints

Given the location of the works, there were a number of constraints which were taken into the consideration in the design & planning phase:


  • Works in and above and in close proximity to an operational station on former sidings

  • Works over and adjacent to a live railway

  • Forming a Temporary Station and maintaining safe access for the public

  • Works in close proximity to a watercourse

  • Multi-storey construction: enhanced Fire Management Strategy etc.

  • Limited space & multi-storey: required Tower Crane for building process

  • Shared access constraints with public, taxis and site in tight access road

  • Close proximity to existing residential homes with security, noise, dust, vibration issues

  • Ground Conditions, Stability Issues & shallow Groundwater

  • Potential for Unexploded Ordnance & Environmental and ecological issues


Services Provided

Pre-Contract Principal Designer, Competency checks, CPHSP & RAMS review & Draft H&S File. Bi-monthly Client & SHE Monitoring for contract duration. CDM advice & RAMS review for Sales Units, PD for late design Sprinkler Installation Works (New PC) & Review of PC’S H&S Files.