Haywards Heath Station Re-development

The Solum Haywards Heath Station redevelopment provides an improved integrated transport hub and transformed the station quarter with a 4 -storey steel framed Carpark with new linked footbridge across the railway tracks, a radically enhanced public realm, re-cladding & new canopies, Infrastructure including S278 Works, a 45,000 sq ft steel framed Waitrose Store with Wine Bar & Café, carparking and service yard plus additional retail and restaurant units. The works were phased with construction of the multi-storey carpark first, enabling the construction of the Waitrose store. The station remained operational throughout the works.

Client(s)

Principal Contractor(s)

BAM & Bourne Parking

No. of Units

Station, Carpark, Footbridge, Retail

Key Constraints

Given the location of the works, there were a number of constraints which were taken into the consideration in the design & planning phase:


  • Works in close proximity to an operational station

  • Maintaining safe access for the public

  • Works over and adjacent to a live railway

  • Demolition & Asbestos Removal

  • Multi-storey construction

  • Limited space & multi-storey: required careful positioning of Cranes for build process

  • Nursery School on boundary & local retail & residential

  • Ground levels

  • Co-ordination between Principal Contractors including Fit Out Contractors

Services Provided

Pre-Contract Principal Designer, CPHSP & RAMS review & Draft H&S File. Bi-monthly Client & SHE Monitoring for contract duration. CDM advice & RAMS review for Sales Units, PD for late design Sprinkler Installation Works (New PC) & Review of PC’S H&S Files.