Project Overview:

This residential scheme comprises 91 units with basement parking and private and communal amenity space. The structure, constructed in three blocks forms a continuous structure, is a re-inforced concrete frame on piled foundations.

 

The site previously housed a 1970’s industrial laundry and office buildings which were demolished prior to construction of the new block.

 

 

Key Works:

Balham_Walk

Key Constraints:

With such major development works there were several constraints involved in the project which were integrated into the design and planning phases to reduce the risk involved during the construction phase:

Sensitivity to surrounding area and local community

Works to boundary of existing residential properties

Adjacent to the Croydon and Clapham Junction railway track

Office Block adjacent

Proximity to Local Nursery and Schools and Doctors Surgery

Multi-storey construction: enhanced Fire Management Strategy etc.

Limited space & multi-storey: required Tower Crane for building process

Close proximity to existing residential homes with security, noise, dust, vibration issues

Environmental and ecological issues

Balancing design with maintenance issues & operational safety

Client:

 

CDM Co-ordinator

+ Client CDM Advisor

Taylor Wimpey South Thames

 

GHPC Group Ltd

TW_LOGO_CMY - Cropped

Demolition of former industrial and office buildings

Services diversion & re-routing

Remediation

RICS logo online black landscape.jpg
JPEG Logo - SMAS SSIP - Mono

GHPC Group Ltd © 2019

t: 01344 304 800

Registered in England at 11 Milbanke Court, Milbanke Way, Bracknell, Berkshire, RG12 1RP

No: 618 3571

APS Corporate Member - mono - CROPPED
In-2C-128px-TM
twitter-bird-white-on-blue
HBF08 MemberOfLogoFINAL
2813 GHPC Final Logo HiRes
GHPC - Construction Support - New (1280x960)
Nav 2 left black large
CDM-C Photo - Large

Home > Portfolio > Balham

bottom of page